Good morning.
I have created a structure, above a group of events with subbi, to which is bolted a road (binary) created with the sweep command.
the track (ipe) has a path equal to a "u" reversed: it has a straight stroke, a curve of 90° dx, another straight stroke, another curve at 90°dx to end...