I'm in a difficult situation.
I'm designing a pump and so I have to size the components. I am new in this company and so I know little about the industry, I work as an employee.
as a base of departure I followed the indications of the holder, but at the moment to check the hold of the components I find one of them that has values from breaking. I therefore communicate the thing to the holder indicating the need to change the size to avoid breaks.
and here arises the problem, the holder does not want to change the piece because in the past they have never occurred breaks.
for two days that I point out that the pieces made in the past did not present similar but much lower values, I presented 2 other hypothesis of sizing supported by relative calculations but there is no way to make him change his mind.
I don't know how to move now. refuse to do the job does not seem correct, I could do as the owner says but then at the time when the problems arise how the thing develops?
first of all who is responsible? Can I find any objections about this?
or am I just entering the name of the owner in the "visto" of the cartiglio and am I okay?
or should I sign something that declares the responsibilities of those who wanted to follow that road in design?
thanks to all for the advice.
I'm designing a pump and so I have to size the components. I am new in this company and so I know little about the industry, I work as an employee.
as a base of departure I followed the indications of the holder, but at the moment to check the hold of the components I find one of them that has values from breaking. I therefore communicate the thing to the holder indicating the need to change the size to avoid breaks.
and here arises the problem, the holder does not want to change the piece because in the past they have never occurred breaks.
for two days that I point out that the pieces made in the past did not present similar but much lower values, I presented 2 other hypothesis of sizing supported by relative calculations but there is no way to make him change his mind.
I don't know how to move now. refuse to do the job does not seem correct, I could do as the owner says but then at the time when the problems arise how the thing develops?
first of all who is responsible? Can I find any objections about this?
or am I just entering the name of the owner in the "visto" of the cartiglio and am I okay?
or should I sign something that declares the responsibilities of those who wanted to follow that road in design?
thanks to all for the advice.