• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

design issue in hold

  • Thread starter Thread starter stunt88
  • Start date Start date

stunt88

Guest
Good morning to all,
would you clearly indicate to me the meaning of emission drawings in "hold"??
 
never use these terminologies.... let's see if someone used them somewhere.
would mean to keep drawings....boh
 
probably refer to the "states", i.e.: released, in processing, obsolete, frozen etc. etc., should be something to do with the pdm.
 
I believe that hold means that they are still retained by the office and are not released officially, maybe they are waiting for answers from other agencies to be defined!
 
I believe that hold means that they are still retained by the office and are not released officially, maybe they are waiting for answers from other agencies to be defined!
certainly should be this the right interpretation of the term
 
the written hold, I always put it to pararmi the ass from any changes of the last minute, especially when I miss some data, or infoirmations, that delay to arrive. so the workshop when he takes the drawing, maybe he leaves it last, or he's scrupulous to make me a phone call, in the spoerance that in the meantime I got the missing information.
 
the written hold, I always put it to pararmi the ass from any changes of the last minute, especially when I miss some data, or infoirmations, that delay to arrive. so the workshop when he takes the drawing, maybe he leaves it last, or he's scrupulous to make me a phone call, in the spoerance that in the meantime I got the missing information.
it would be appropriate that a design in "hold" is not sent into production. . .
 
in the field of the boiler is a annotation with clouds to identify components not yet defined as mouths, supports or other. appears on the revisions of the designs submitted between the manufacturer and the engineering company that oversees approval for construction of the tank. Since the times can be long, the design is also sent to the workshop to start the construction obviously omitting the particular in "hold" until it is confirmed.
 
in the field of the boiler is a annotation with clouds to identify components not yet defined as mouths, supports or other. appears on the revisions of the designs submitted between the manufacturer and the engineering company that oversees approval for construction of the tank. Since the times can be long, the design is also sent to the workshop to start the construction obviously omitting the particular in "hold" until it is confirmed.
I know, having worked in the field...
 
in the field of the boiler is a annotation with clouds to identify components not yet defined as mouths, supports or other. appears on the revisions of the designs submitted between the manufacturer and the engineering company that oversees approval for construction of the tank. Since the times can be long, the design is also sent to the workshop to start the construction obviously omitting the particular in "hold" until it is confirmed.
These preliminary drawings are used to order semi-finished products (sheets, packings, etc.) and to prepare, if necessary, equipment.
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top