MaZo
Guest
Bye to all,
work in a turnout and we need to unify the symbols in the drawings to report the various functional/critical/special odds.
each customer has its own standard (who uses a square who a circle who asterisk it etc...)but I wanted to understand if there was a rule explaining these symbols.
for now internally we are using a * for "critical/functional and technological" quotas, a spc symbol for all quotas that must be saved in phase of production control and then a triangle with legend for the quotas that require the cp/cpk, 100% control or particular documentation.
Can it be okay as a system or can it be improved?
Thank you. .
work in a turnout and we need to unify the symbols in the drawings to report the various functional/critical/special odds.
each customer has its own standard (who uses a square who a circle who asterisk it etc...)but I wanted to understand if there was a rule explaining these symbols.
for now internally we are using a * for "critical/functional and technological" quotas, a spc symbol for all quotas that must be saved in phase of production control and then a triangle with legend for the quotas that require the cp/cpk, 100% control or particular documentation.
Can it be okay as a system or can it be improved?
Thank you. .