TECNOMODEL
Guest
Something strange happens to me somewhere.
if I change a processing, even moving only 0.01 the sketch, loses references for an offset plan from another floor.
the problem is that the 2 jobs are not minimally connected.
what can the problem be due to you?
if I change a processing, even moving only 0.01 the sketch, loses references for an offset plan from another floor.
the problem is that the 2 jobs are not minimally connected.
what can the problem be due to you?