Bobo75
Guest
I write here asking if this is feasible. I have been using caia for more than a year, still without course and come from about 15 years of solid edge. premitting that I find this software really sluggish, little intuitive and sometimes with behaviors from "uccs" (office complication simple things ) not having done a course I'm still blaming myself, but I don't know if it will last much longer this consideration before going to blame the software and not the person.. .
finished or come to the request.
I created a part using the multibody speech (which I was not used to coming from solid edge ). But I was wrong to link the solids. I'll explain better, I've made a pasted copy with connection to the various solids for the boolean operations I needed. but I did the operation from the files copied on the work folder and not from smart team (pdm ) and in this case there should be no problem, the second series however I did the special paste copy from another part where there were the same works assuming erroneously that if on that file the connection was from the friezes copying them on another file the program would still fish the connection from the friezes and instead not the fishing from the final file. ...
Is there a way to replace the links by going to copy from the original files without having to make it all over again? (which I would find quite absurd).
Does there also exist a way to review in the part the solids of the body copied to create constraints in case there is forgotten to do so in the first instance?
I hope to receive answers that help me avoid doing all over again.. .
thanks in advance
finished or come to the request.
I created a part using the multibody speech (which I was not used to coming from solid edge ). But I was wrong to link the solids. I'll explain better, I've made a pasted copy with connection to the various solids for the boolean operations I needed. but I did the operation from the files copied on the work folder and not from smart team (pdm ) and in this case there should be no problem, the second series however I did the special paste copy from another part where there were the same works assuming erroneously that if on that file the connection was from the friezes copying them on another file the program would still fish the connection from the friezes and instead not the fishing from the final file. ...
Is there a way to replace the links by going to copy from the original files without having to make it all over again? (which I would find quite absurd).
Does there also exist a way to review in the part the solids of the body copied to create constraints in case there is forgotten to do so in the first instance?
I hope to receive answers that help me avoid doing all over again.. .
thanks in advance