zeigs
Guest
Good morning. I set a simulation with three-dimensional elements in which contact zones are present, with 4 load cases. as his usual nastran solves the matrices and then begins a process of iteration to solve the contact. here everything in the norm. solved (immagin) case 1 in about 100 hours, and now it is solving case 2, and we are at an altitude of 197 hours. only that even if no anomaly is reported, both the disk and the cpu are completely scarce, so I have the impression that somehow it has stuck. how can I check the status of activity and possibly unlock it without losing the job done so far?