• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

numbering seen in "drawing" environment

  • Thread starter Thread starter romy
  • Start date Start date

romy

Guest
Hello everyone,

I often do multifoil tables

usually recover drawings from old projects and then go to copy the sheets one behind the other in the main file

here nothing strange but the numbering of views goes crazy and numbers are put at home or that I do not understand

also the name of the fury sheet to paste sheets with the same name goes to mess up

I know that it is from maniac but it is possible a macro that can do:

- rename all sheets instead of "sheet1, sheet2 etc" in "01, 02 etc."

- rename all the views of all the leaves in an increasing way from the top true bass starting from 1?

greetings
 

Attachments

  • Vista.webp
    Vista.webp
    7.6 KB · Views: 7
but rather than writing a macro, I would understand where the problem is, I do not use your system many times; a file a table but sometimes it happens to me, and I did not find your problem.
Plus we have the same version of solidworks.
see if they are old designs and before importing them into the main file save them with version 2023, the template you use is made as 2023? or is he old? update it.

Hi.
 
Hi.

I'm sorry, but honestly, I didn't understand anything you wrote.

I simply need to number the views progressively from top to bottom

are multifoil projects as the customer wants it so

but sometimes by taking single drawings from old projects or by copying and recovering similar tables the numbering goes mad or follows an order from sw

I would just want to renumber them... all here

Hi.
 
Hi.

being old drawings probably mess up, or at least I think, the thing I recommend is to open old drawings, before moving the tables and reuniting them, and save them in the new version; it will look like a cag..ta but so doing the file is updated to the new version and then (think), some errors will be corrected.
It's an attempt...
I'm telling you, it doesn't happen, and I always do that. even with templates, I always attach them to the latest version of solid.

Hi.
 
Good morning.

are not old drawings

the work for production is made that each part has its design in a dedicated single file (as you say)

so you work fast without always reloading the general one with all the project (500mb table)

when the project is finished the customer wants a single file with all drawings in numerical sequence

so I take the sheets of the individual files and cover them/neck in what the customer wants

when I make this manoeuvre, the views are automatically renumbered by sw with numbers that I do not understand

for if nothing happens

It's just that for my visual order or call it a paranoia I would like all the sheets and all the views to be numbered in succession from top to bottom

now I have a project in finalization with 70 sheets and hundreds of views

the sheets I make them by hand numerandoli propio 1,2,3 etc without the word "sheet" that puts sw

but the views are so many and it would take so long

I've tried to make the views but sometimes it's in conflict as it tells me that the view I'm bashing already exists...in another sheet I don't know where

I am therefore compelled to re-umerate a first time with a hyphen "-" or another sign so as not to ship conflicts

then make a new round by removing the hyphen or what I put

I hope it is clear

greetings
 
Unfortunately you have to use a macro for this, but I don't understand the problem then.... .
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top