• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

sync

  • Thread starter Thread starter bigsnake
  • Start date Start date

bigsnake

Guest
Good evening.

is it possible to set a total synchronization within a product, with the same modes as the "upstream" command?
or alternatively, can you view the list of unsynchronized body or part?
My license doesn't include pdm.

having in my product many parts connected with reference in cascade between them, it turns out to be rather uncomfortable having to sync them manually one by one.

thanks in advance
 
try to see in tools\options\assembly design\ if you set manual update and at all levels ........ I hope I have understood the request :)
 
Yes, I confirm that they are in manual update and at all levels.
I also have exact calculation of the update status when opening on manual.
 
I do not understand what discriminants for which the copy with a body connection, following a change of the father, should be only updated or should be first synchronized and then updated.
 
Okay... .
try to see in tools\options\part infrastructure\ automatic update - interrupt update ...... - sync all external references... if you activated them.
 
Unfortunately I do not use that working strategy ................ We wait for someone who uses it and can give you tips about it........
 
I did a quick test...... 2 part, 1 copied with connection, and then added a body....
put in a set and changed the parent part, in the product asks me the update, given the manually update all (only 2) the files have updated .................... (for synchronization you want to update files ....?????? Right? ? )
 
Bye-bye.
I've been a little late for some tests.
I didn't have the check on synchronizing all external references, and I think that's the solution.
I've changed the pc for a few months, and probably before I worked with the triggered check, without knowing how to use it.

I respect your last email I have to make you a statement: synchronized and updated are not the same thing....sync is a kind of intermediate phase.
If you change a father, the son becomes red and ready to upgrade.
with this "automatic" synchronization you can update all the product in block.
with the deactivated check, when you change a father, the son does not become red and the icon in the tree of the active connection of the body (green card) becomes a red x. at this moment the prodoct is updated and the spiral icon is turned off. to be able to update, you must first go to the body with the dx button and do object/synchronize. only now the son will become red and then be upgraded.
That's why I talked about an intermediate phase.

My analysis is the result of my personal experience, I hope I haven't written anything wrong.
In fact, I invite anyone to correct me.

in any case, thanks mc
 
............ thanks x the explanation , cmq is a "technique" that I do not use x do not have additional links besides those of the part and product :)
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top