• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

what pdm? ? ?

  • Thread starter Thread starter rapa
  • Start date Start date

rapa

Guest
someone can tell me if the pdm program named pe2 sold by the inscription is
reliable since what we currently use workmanager I consider it
an authentic disaster in practical terms
thanks for any answers
 
someone can tell me if the pdm program named pe2 sold by the inscription is
reliable since what we currently use workmanager I consider it
an authentic disaster in practical terms
thanks for any answers
but you need a pdm (product data manager), then a data management system of engineering of a product or a cad data manager, then a data vaulting system cad?
... makes a certain difference... and direct the answers you can receive.
ps. I pe2 of isigraf never saw it implemented or felt like pdm system...
is it specific for some industry?
 
I am not experienced ....I can only say that we currently use wormanager (programme now obsolete for what has been said) to create the distinct base of the projects, create the ball in annotation and transfer everything to the purchasing office, all here.to we designers then use research on parts or groups of the project according to certain specifications.
 
I am not experienced ....I can only say that we currently use wormanager (programme now obsolete for what has been said) to create the distinct base of the projects, create the ball in annotation and transfer everything to the purchasing office, all here.to we designers then use research on parts or groups of the project according to certain specifications.
in the choice of the pdm you must also take a lot into account the erp, otherwise you always risk buying a program not properly compatible and kill yourself to try to communicate the 2 systems, suffice if you talk about bom transfer.
Since you use osd you should evaluate the pdms of the ptc, also because we are sure that the workgroup manager is first of all free and second it works!:tongue:
pdmlink,intralink or sharepoint.
 
My dear rape, this is a jungle.

apart from the jokes, the pdm is one of those things that you cannot choose to "feel" say, usually you have to do a business requirement inside a little more in-depth if you do not want to stumble into bad surprises, this is a passionate advice that I feel in need to tell you.

Why did you start citing pe2?
 
I have some confused ideas.... .
Maybe we helped make things worse. . .
Sorry.

However, pdm is a very extensive theme and it is easy to achieve high complexity because the corporate departments involved are many:
- technical office
- sales
- post sales
- manufacturing
- times and methods
etc.
 
I quoted pe2 because this is what it proposes company that usually follows us, the same that proposed workmanager.
ours is a small company and the project management program only serves in technical office where we use both osd and m10.
the connection with the purchase office via a text file of the separate base, then in that office it is used as\400 and other programs to which we do not care since the connection is only in one sense.
 
I use pe3 of the cdm isigraf and until 5 years ago I used workmanager. pe3 is more friendly and lets you do a lot more things. As for reliability, I don't understand what you mean: workmanager also found it hostile, heavy etc. but had no malfunctions.
 
thanks for the information I agree with what I said I will ask the difference between pe2 and pe3
 
a quick note.
work manager is heavy and complex, but it handles the whole process.
what can serve for cad (as bvm said) is the model manager, product cocreate snello and fast dedicated to ut management.
See what you need, I'm convinced that mm (model manager) is what you need without going to third-party products, which are often "recoated" and customized mm.

Greetings.

Sorry, but I'm in a hurry.
 
I agree with Mr President......... .
I also recommend mm to never have any problems in the future for any upgrades.
we currently use model managers without particular customizations.
if your company is a small company and you only need it for management in u.t. It's perfect for you.
stable, fast, simple, customizable.
save money and do not go on software customizations that bind you to the seller for any problem.
Hi.
 
someone of you can tell me if the pe2 solution is enrolled with pm3 (file encryption program)
Is that valid? do you know if the pm3 program is working with model manager?
 
someone of you can tell me if the pe2 solution is enrolled with pm3 (file encryption program)
Is that valid? do you know if the pm3 program is working with model manager?
(ii) the use of a system which is designed to improve the quality of the product;
 
You're safe for classes. ?
by classes in mm means a group of database elements with the same attributes example drawings, models 3d.
perhaps you mean attributes, example code, description, material, treatment.
mm is customizable and allows you to add the attributes you want at any time.
Hi.
 
I was told that the attributes in mm are customizable at will but it is not possible to create different categories (classes) such as frames, paperwork, specific group with specific attributes such as different basic date.I have remarked that maybe it would be enough to create in mm a large amount of attributes maybe displaying only some for a specific category of groups...but not knowing specific ring mm I will probably be forced to use proposed pe2.
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top