Zed87
Guest
in these months I am carrying out a master's thesis in which I have to evaluate the realization of a lay-out of an industrial plant of foundry to realize with process no-bake in bracket, throws from 5 to 10 tons of weight, with productivity of 2 brackets per hour, then low productivity. the drying of the refractory plaster in the mold is expected to be carried out for flambatura. How can I assess the times of this process? also, how to assess the size of the vibrating disconnector grid?