• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

automatic extrusion quota

  • Thread starter Thread starter Gianlucagiangian
  • Start date Start date

Gianlucagiangian

Guest
Hello.

is it possible, according to you, to create a data in personalizations, to say, to call it length, and to make sure that it is updated as a field, in a utomatic way, to make sure that it can export it later in separate without changing the data manually?

Thank you.

janluca r&d department - sent by my huawei p30 lite using tapatalk
 
you just want to show the data in the distinct?
if that's all you need to flag the parameter you want to export1581375446359.webpwhen a data is flagged as to export is placed in iproperty with the parameter name, in this case "d2".
in separate you have to add the column connected to the property you want1581375570269.webpat this point when you change the value of extrusion or what is the distinct will show the changes.
changes made in separate do not affect the parameter, in this case "d2".
if you want to make parameterized components you should do as it showed @matteo hats dis.cad using the modules and if the case some ilogic rule.
 
you just want to show the data in the distinct?
if that's all you need to flag the parameter you want to exportView attachment 56234when a data is flagged as to export is placed in iproperty with the parameter name, in this case "d2".
in separate you have to add the column connected to the property you wantView attachment 56235at this point when you change the value of extrusion or what is the distinct will show the changes.
changes made in separate do not affect the parameter, in this case "d2".
if you want to make parameterized components you should do as it showed @matteo hats dis.cad using the modules and if the case some ilogic rule.
What you say I thought about it, but I wondered, the extrusion always goes in d2? because otherwise it doesn't make sense that I have to put my hands back. I didn't try, but as I suppose the extraction isn't always in d2 (in this case), I don't like it. I must always have an equal value because of the management that must give the data. Now I'll try the other way they suggested me. for what concerns ilogic, unfortunately I am not hardware.

janluca r&d department - sent by my huawei p30 lite using tapatalk
 
The question is that there must be a logic to expose the data. if there is this logic with little effort you realize what you want. For example, is the share you want to export linked to extrusion no. 1? or does extrusion have a particular name? Once you answer a few questions you find the solution.
If you're interested, I'm integrating cad and management (the most important part of my work), I'm creating an integration for a management of Tuscans, time srl, maybe use the management logo :).
However, if you explain the situation I give you the solution and if it's just exposing a data I write the code for ilogic without problem.
 
the curious thing is that we are integrating own time, among other things come today, it is not an important parameter to say the truth, but since we are changing management, and the cutting measure, for example of a tubular, we insert it, it could be convenient to get it out automatically. currently, it is set in manual. the idea would be like, take advantage of the custom field measures_cut and make them peel, turn the measure in mm.
 
Who follows you? What?
I strongly advise you to ask the time how integrations are with them, I worked with:
michele joints (we are making a project together at this time)
francesco bernardini
france lucatelli
and others I don't remember the name.
the integration system allows you to connect everything and dynamically. The question you say is that of the contained center. to do the job that you expect the management for each ipt you have to create a derived "great" article that serves to make orders.
I really recommend asking them and then contact me
 
@gianlucagiangian If you want to pull out the size of a structural element of the content center you can make the link in the table. You practically say that some property must be exported to some iproperty. that is very simple only that does not involve you also the past, that is all those documents created before changing the table
 
@gianlucagiangian If you want to pull out the size of a structural element of the content center you can make the link in the table. You practically say that some property must be exported to some iproperty. that is very simple only that does not involve you also the past, that is all those documents created before changing the table
That wouldn't interest me, it would be enough for me to work today.

janluca r&d department - sent by my huawei p30 lite using tapatalk
 
Okay, if it's about the content center do as I wrote you and it works, otherwise it's worth the answer in the other discussion, call me that I show you how to do
 
Okay, if it's about the content center do as I wrote you and it works, otherwise it's worth the answer in the other discussion, call me that I show you how to do
Thank you. You solved my problem.

Thank you. @antimeter for the technical support that provided me, it was professional and kind.
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top