Viollo
Guest
Good morning to all,
I have a question: in my work it often happens to have to realize a 3d model, complete with subsequent putting in the table, and then to have to realize of the equipment "contour" (e.g. for assembly, or production) starting from the original model. In practice, until now I have always copied the original model, and from rework it to find the equipment you want.
the problem arises when a change to the original model is necessary. If in the meantime I had made 6/7 "contour" equipment, I would have to change 6/7 models besides the original one, which as you can imagine, can lead to errors and discrepancies.
Is there a more practical way to cope with this situation?
Thank you in advance for any answers.
Have a good day!
I have a question: in my work it often happens to have to realize a 3d model, complete with subsequent putting in the table, and then to have to realize of the equipment "contour" (e.g. for assembly, or production) starting from the original model. In practice, until now I have always copied the original model, and from rework it to find the equipment you want.
the problem arises when a change to the original model is necessary. If in the meantime I had made 6/7 "contour" equipment, I would have to change 6/7 models besides the original one, which as you can imagine, can lead to errors and discrepancies.
Is there a more practical way to cope with this situation?
Thank you in advance for any answers.
Have a good day!