• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

calculation sterro dig per house (autocad? )

  • Thread starter Thread starter ragnol
  • Start date Start date
to me are 913.01 mc of excavated material.
It is possible that there may be differences between one calculation and the other because of the different triangulations that can be obtained.
the procedure is that adopted by gp that I thank infinitely for advising me the triangulate lisp that works perfectly.
what I used before was good only for a few points.
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top