• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

computo per fasi

  • Thread starter Thread starter Denielsan
  • Start date Start date

Denielsan

Guest
Good morning, everyone!
I have a problem with computs: I want to calculate the volumes of all concrete beams of a certain phase of my project, but by selecting the phase from the left drop-down menu it seems that I do not get any results, as if the "step filter" did not work:confused. It seems absurd to me that it is not possible to make a calculation by stages. I read a previous discussion in which it was said that it is possible to do so. Can someone give me a tip?
Thank you very much
 
It seems absurd to me that it is not possible to make a calculation by stages.
It is absurd. when you create an abacus one of the required information is precisely the stage of membership. you are definitely wrong something...what is difficult to say without the file under your hand
 
... maybe it is <filtri delle="" di="" fasi="" lavoro=""> is not set correctly ...

e.g.
filter name --> concrete beams
new --> per category
existing --> not displayed
demolished --> not displayed
temporary --> not displayed

... maybe?
Mar</filtri>
 
thanks tristan! the problem that remains to me is that I sum up the previous steps with the phase that I am considering. e.g.: if in phase 1 I have 20m3 and in phase 2 I 25m3, making the compute and putting as a filter from the left drop-down menu phase 2 gives me a compute with total volume of 45m3. I would just like to know the volume of phase 2, that is 25m3.
 
if you can see the elements from different stages, it means that you have not selected a phase at the beginning of the process for the creation of the abacus.
 

Attachments

  • 5-30-2013 11-31-42 AM.webp
    5-30-2013 11-31-42 AM.webp
    2 KB · Views: 4

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top