Esselle
Guest
Good morning, I often draw frames with various laser cut plates, of which, for practicality I insert the drawings of developments in the same table of the frame.
I then use the function "link bubble text to the specified table", to identify the various elements.
in some situations I also have 30 or 40 sheets to "bollare", I would like to know if it is possible to let solidworks know that 30 views at the same time must refer to the specified table, instead of having to do this one view at a time, thanks.
I then use the function "link bubble text to the specified table", to identify the various elements.
in some situations I also have 30 or 40 sheets to "bollare", I would like to know if it is possible to let solidworks know that 30 views at the same time must refer to the specified table, instead of having to do this one view at a time, thanks.
