GioC94
Guest
Good morning
I worked with solidworks 2014 and wondered if it was possible in this version (or later) to do this process.
often happens in my daily newspaper of having to take a set, copy it on another path and, having to detach all the references from the original one, take all the subassies and all the parts connected to them and have to rename and replace them (to remove any reference to the original files precisely).
the question is: is there a way to make the process faster? Is there a function in later versions that allows me to do this step almost automatically?
Thank you.
I worked with solidworks 2014 and wondered if it was possible in this version (or later) to do this process.
often happens in my daily newspaper of having to take a set, copy it on another path and, having to detach all the references from the original one, take all the subassies and all the parts connected to them and have to rename and replace them (to remove any reference to the original files precisely).
the question is: is there a way to make the process faster? Is there a function in later versions that allows me to do this step almost automatically?
Thank you.