yudansha
Guest
good day to all I am a student of mechanical ing,
I wanted to open a general discussion about a "problem" regarding the production of a new product.
reducing the stages to the bone, we could say:
the design department delivers to the production the engineering of the product (models cad, etc.). at this point the production department defines the various technological cycles, times and methods to send the new product into production (magari on a pilot line).
before the product enters production line in a definitive way, it often returns to the design stage to solve problems that occur in the production phase.
what I ask at this point, referring to your practical experience on the field:
What are the most recurring motivations of these "loop-backs"?
in an optimisation of times, I wonder (always with the support of those who live these things every day): Is there any information that one department or the other would already want to own to not have to resort to the project?
a chat that is sometimes so bad to give me a more precise idea about the major criticalities:biggrin:
thanks to all and good work
Edoardo
I wanted to open a general discussion about a "problem" regarding the production of a new product.
reducing the stages to the bone, we could say:
the design department delivers to the production the engineering of the product (models cad, etc.). at this point the production department defines the various technological cycles, times and methods to send the new product into production (magari on a pilot line).
before the product enters production line in a definitive way, it often returns to the design stage to solve problems that occur in the production phase.
what I ask at this point, referring to your practical experience on the field:
What are the most recurring motivations of these "loop-backs"?
in an optimisation of times, I wonder (always with the support of those who live these things every day): Is there any information that one department or the other would already want to own to not have to resort to the project?
a chat that is sometimes so bad to give me a more precise idea about the major criticalities:biggrin:
thanks to all and good work
Edoardo