Stefano.bp
Guest
Hello everyone, I looked for the topic but I didn't find a post about it.. I tried wrong.I must represent works that count in a leveling of a wall of cinta and in the partial leveling of the above ground.
I have created a project surface with leveled region, are ok, but in section overlap the reasons for demolition and construction.
(in the attached image I have eliminated the demolition of the earthennus but as it is known the red overlaps to the existing surface.
In fact, I have to have in red only the excess beyond the existing...it does not do with the topographic surfaces, does it? I don't know.
How could I proceed? . .
Last edited:
