And they were good to all. .
two easy questions first morning:wink:
I have to make some changes to a project imposed by the building committee.
in addition to the current and project phase I created a subsequent call conditions.
in project I demolished what had to be changed, for example the terraces with insole thickness 50 cm I demolished them to rebuild them 35 high, is it correct?
My purpose is to maintain the situation presented the first time.
is it normal that when I take a view and change phase do not cover the local labels?
a change was about the paint: how do I paint the buildings in the new phase leaving the old colors in the design?
thank you all, good day!
two easy questions first morning:wink:
I have to make some changes to a project imposed by the building committee.
in addition to the current and project phase I created a subsequent call conditions.
in project I demolished what had to be changed, for example the terraces with insole thickness 50 cm I demolished them to rebuild them 35 high, is it correct?
My purpose is to maintain the situation presented the first time.
is it normal that when I take a view and change phase do not cover the local labels?
a change was about the paint: how do I paint the buildings in the new phase leaving the old colors in the design?
thank you all, good day!