• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

link between cad 3d and management

  • Thread starter Thread starter genesis1975
  • Start date Start date

genesis1975

Guest
goodwill to all, I believe that the majority of you know the answer to my question because I was in charge of "starting" a technical study where there was still no one... but there was already a production and models, reason why I did the reverse path by detecting with the instruments of measurement all the parts of the existing models, making the assemblies and then the constructors of each part, creating a distinct base...
 
we have a program that is called "to fulfill", they asked me "brutally" if solidworks can generate a distinct base to feed to "to fulfill" so that automatically I get out the prices....carino and?
 
maybe you could say something more about this management without having to do a third degree to have information
 
No, I don't want to get the words out of my mouth but I really don't know what data to provide, what is it for you to answer my question....if you need any precise features then I'll inform you and I'll tell you...but unfortunately things ask me so without too much explanation if you can help me. .
 
begins to describe the management: how it works, what kind of file it uses, whether and how it interfaces with other programs, which data manages and ......
 
In fact it seems that modern cad more than caring for modeling take care of project management, and the pdm does it as master. at this point the desire to find a solution tailored to your needs begins to resemble the invention of hot water. to keep in mind that, given the nature of fulfilling (https://it.wikipedia.org/wiki/adempiere), could already exist anything.

If I had to deal with it, I would start contacting the management provider, so the cad provider.

I have to say, however, that, since we have taken the brigade to redesign all the catalog, updating by hand the catalog in the management I think the least...
 
serve a customised pdm according to your needs. of products there are many on the market, you have to look at some of them to understand what is closer to your needs.
 
we use pumpkins ad hoc revolution
I carry the bom in excel the amount in adhoc and the management already prepares the orders to the various suppliers.
 
we use pumpkins ad hoc revolution
I carry the bom in excel the amount in adhoc and the management already prepares the orders to the various suppliers.
You can explain yourself better.
I have an axis composed of drawing parts and commercial parts. How is everything handled?
 
we have only axioms of commercial parts, the axieme must return only a list of commercial parts to order or withdraw to warehouse
once the bom is extracted, it must be purged by the hand of what is not needed (some columns) and then imported into the management that reads the code and quantity and prepares the orders that are only to edit if necessary and then send.
 
I agree with those who say to lean on a pdm, to make the mere transmigration of the bom in the next 2020, is reductive.
in the company from me we use ruledesign pdm and ax as management, the analogue of the basic articles, is made only on the pdm then automatically passed in ax, the variables of pure management, then remain on ax, but the data cad (including the description) are managed by the pdm, on ax ends the revision of the drawings and pdf 2d, which are updated automatically to every modification.
bom is passed at the discretion of the designer, creating a technical bom (non-producible or editable on ax), then decides whether to copy it in a production and integrated if needed.
the data passage between one system and the other, is done through excell tables, generated by pdm and read by ax.
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top