oro987
Guest
Good morning to all of you who are reading me,
I've got a quarry degrading from a z=500 to a z= 50.
I choose the strategy "grossing 3d" imposed all the parameters (overmetal toll, step, etc. etc.) but when it shows me the processing, all the lifts makes me to the safety z i.e. 550. My question is, is there a way to avoid that every time he comes out of the piece he gets me up to the security z? . if the quarry is almost horizontal can go well.
but in this specific case the lift times are too long even if it does them quickly.
with the strategy "offset 3d" this problem does not exist, because instead with the strategy "sgrossatura 3d" exists?
I did various tests in the window "wins and junctions" changing the two options on the incremental distance but nothing.:frown:
-pwmill 9
-The cutter to be used is by candle
- the strategy I often use is the constant z strategy i.e. 3d roughness
thanks for the attention
I've got a quarry degrading from a z=500 to a z= 50.
I choose the strategy "grossing 3d" imposed all the parameters (overmetal toll, step, etc. etc.) but when it shows me the processing, all the lifts makes me to the safety z i.e. 550. My question is, is there a way to avoid that every time he comes out of the piece he gets me up to the security z? . if the quarry is almost horizontal can go well.
but in this specific case the lift times are too long even if it does them quickly.
with the strategy "offset 3d" this problem does not exist, because instead with the strategy "sgrossatura 3d" exists?
I did various tests in the window "wins and junctions" changing the two options on the incremental distance but nothing.:frown:
-pwmill 9
-The cutter to be used is by candle
- the strategy I often use is the constant z strategy i.e. 3d roughness
thanks for the attention