• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

pdm - interazione solidworks-ready2works

  • Thread starter Thread starter Cat_min
  • Start date Start date

Cat_min

Guest
Good morning, everyone.
use solidworks (sw) with the ready2works management (r2w).
these two programs interact well but I would like to understand if you can do the following things:

1) materials. the material should be associated (2 times) to the part through and in r2w environment, instead I would prefer to attribute the material in sw environment and that it was r2w to read it automatically. You know how to do it?

2)assiemi-parti. r2w environment, if I have a set consisting of other subaxis and parts, it is possible to select the "father" axieme and that new codes are created for all "sons"? if we have a complex set consisting of hundreds of "children" to create for each one a code is particularly honorable in terms of time and it is easy to forget about the elements.

3)bom.
-every time you list the materials in excel bisgona uncheck the fields you do not need (e.g. "creatoil", "creatoda" etc.) and every time the program loses the settings. Is there a way to get r2w to keep the fields I need for the bom?
- is it possible to extract in one time the list of materials and pipes without having to go to the folder "type" to extract the excel files of pipes?

Thank you for your attention.
 
Good morning, everyone.
use solidworks (sw) with the ready2works management (r2w).
these two programs interact well but I would like to understand if you can do the following things:

1) materials. the material should be associated (2 times) to the part through and in r2w environment, instead I would prefer to attribute the material in sw environment and that it was r2w to read it automatically. You know how to do it?

2)assiemi-parti. r2w environment, if I have a set consisting of other subaxis and parts, it is possible to select the "father" axieme and that new codes are created for all "sons"? if we have a complex set consisting of hundreds of "children" to create for each one a code is particularly honorable in terms of time and it is easy to forget about the elements.

3)bom.
-every time you list the materials in excel bisgona uncheck the fields you do not need (e.g. "creatoil", "creatoda" etc.) and every time the program loses the settings. Is there a way to get r2w to keep the fields I need for the bom?
- is it possible to extract in one time the list of materials and pipes without having to go to the folder "type" to extract the excel files of pipes?

Thank you for your attention.
Hi.

I answer you for what I know:

1- at the moment it is not possible, I do not know if there is any customization to do so, you should feel readysolutions
2-How would you go to generate new codes automatically? without any control? not to forget anything you can use capture, then r2w finds everything that is not coded and proposes it for coding.
3-the type list would serve to divide the components by processing, not to extract materials. lists can be customized, but then they will find themselves so for all uses, not only for excel extraction. What exactly should you do?
 
hire_solidworks. first of all thank you for the quick answer.

I try to deepen the points in question. .

1-as regards materials is a sin there is no way to make it r2w to read them, it would all be faster and avoid "usual" human errors

2-Interesting! Can you describe this procedure with the "catching"? I'm sorry for my ignorance about the command but I can't access the program's guide, on the contrary, I take advantage of your kindness and take the opportunity to ask if you know any links from which to download the r2w guide.

3- I make a premise: for me of fundamental importance is the list of materials of excel. this because, currently, it is the one that takes more time to be adapted according to the business needs.
I'm trying to explain. .

in the r2w window "management reepilogate fields" I always find the following selected fields:

-Code
-description
- Yes.
- epdm code
-created
-createdalle
-material
-id type
- Go back
-weight
-value
-material2
-denomination
-created

to me in the material list always serve the usual 6 fields:

-Code
-description
-quantity
- epdm code
-Materials
-value

to avoid every time you have to uncheck the fields that I don't care or have to delete the columns of unnecessary excels (I don't say it's difficult but it's slender and takes time).

I would also like the columns of the excel list that comes out from the list of materials to be ordered as that of the tubes otherwise besides having to delete unnecessary columns I must also reorder them so that the two lists can be put together in a single material list..it is for this reason that I was wondering if it was possible to have a single excel list for the "materials" and for the "tubes", in this way they would not have to save two lists "grezzes"

I'm sorry if I've been too long and I hope I've made the idea about my doubts

I thank you in advance and I am confident that you can help me solve these little dilemmas.
 
hire_solidworks. first of all thank you for the quick answer.

I try to deepen the points in question. .

1-as regards materials is a sin there is no way to make it r2w to read them, it would all be faster and avoid "usual" human errors
the problem is that the ready material is a raw material, an element available in stock, while in swx is the material. for this if you in swx choose s355j2g3 to what is it? sheet? round? measures? for this the choice should be made on the contrary, it is gross of the same work done on the other screen.
2-Interesting! Can you describe this procedure with the "catching"? I'm sorry for my ignorance about the command but I can't access the program's guide, on the contrary, I take advantage of your kindness and take the opportunity to ask if you know any links from which to download the r2w guide.
open a set to import, click on capture components (fast bar or under new), look if the selections of the parts are ok and catch prizes. leaves you the list of uncoded elements and one to one attributes the encoding root and properties.
you can as always use the drag & drop from the general list for compilation. I usually fulfill the properties of 6-10 items and then amount. Then I repeat the operation until details are detected to be imported.
3- I make a premise: for me of fundamental importance is the list of materials of excel. this because, currently, it is the one that takes more time to be adapted according to the business needs.
I'm trying to explain. .

in the r2w window "management reepilogate fields" I always find the following selected fields:

-Code
-description
- Yes.
- epdm code
-created
-createdalle
-material
-id type
- Go back
-weight
-value
-material2
-denomination
-created

to me in the material list always serve the usual 6 fields:

-Code
-description
-quantity
- epdm code
-Materials
-value

to avoid every time you have to uncheck the fields that I don't care or have to delete the columns of unnecessary excels (I don't say it's difficult but it's slender and takes time).

I would also like the columns of the excel list that comes out from the list of materials to be ordered as that of the tubes otherwise besides having to delete unnecessary columns I must also reorder them so that the two lists can be put together in a single material list..it is for this reason that I was wondering if it was possible to have a single excel list for the "materials" and for the "tubes", in this way they would not have to save two lists "grezzes"

I'm sorry if I've been too long and I hope I've made the idea about my doubts

I thank you in advance and I am confident that you can help me solve these little dilemmas.
for customization of the re-epilogate I have to look at it so, the other lists can be customized directly from the maintenances, the re-epilogate I do not remember.

Hi.
 
the problem is that the ready material is a raw material, an element available in stock, while in swx is the material. for this if you in swx choose s355j2g3 to what is it? sheet? round? measures? for this the choice should be made on the contrary, it is gross of the same work done on the other screen.
about this point you convinced me regarding the material. Perhaps the only note that remains to be done is that I would prefer to insert once the matrial encoded..es: s355j2g3 we assume that this code is combined with a bar 120 sp.10 aisi 304, in theory, in the code should already be inserted all the necessary information, including the matrial. .
open a set to import, click on capture components (fast bar or under new), look if the selections of the parts are ok and catch prizes. leaves you the list of uncoded elements and one to one attributes the encoding root and properties.
you can as always use the drag & drop from the general list for compilation. I usually fulfill the properties of 6-10 items and then amount. Then I repeat the operation until details are detected to be imported.
thanks for the suggestion!
PHP:
for customization of the re-epilogate I have to look at it so, the re-epilogate I do not remember.
thank you again for the availability.. you would do me a great pleasure
Other lists can be customized directly from maintenance
I tried to get into maintenance->personalized but you can't change the fields or reorder them. maybe I'm wrong.

refer to some r2w?mi manual would be very useful

Hi.
 
Last edited by a moderator:
Hello, Reggio,

Thank you for your intervention. .very appreciated. I was only able to take a fugitive look at the subject you dealt with and it seems really interesting. tomorrow I will read it very carefully (this evening I finished late and I have the mental clarity of a day of mist in the plain).

I thank you also for the manual, I hope you will need to escape further doubts.
a sibillina question: why don't you ask for assistance? not satisfied with the service?
we say that I look for quick and precise answers and this site is giving me. .
 
Sorry, I forgot the most important thing. This site is giving me the answers I seek thanks to the people who populate it
 
... then I invite you to make your contribution here: http://www.cad3d.it/forum1/showthread.php?t=35449I don't think you'll be as useful as you hope, in any case you find it attached.

a sibillina question: why don't you ask for assistance? not satisfied with the service?
Reggio, it is not legal to post that manual, it is written in the first pages. mark it to the area mod to remove it. is generally valid for all software, not only for ready.. .
 
Reggio, it is not legal to post that manual, it is written in the first pages.
I apologize.
I have sinned of naiveness thinking that it was not about passing a pirate program or something, but only of "a piece of paper".
to my partial disclpa I say that, this manual, having not received it together with the update but having requested it immediately but received only after several insistences, I thought that also cat_min was in my same situation and that therefore, while having the program had not yet received the manual... :frown:

I apologize again...

and subscribe to your request for removal.
 
Sorry I'm late for the answers, but I had to disagree for work. .

I also apologize for asking for a manual for r2w but it is particularly difficult to find information material on the program and, as already posted earlier, it does not work me the help of the program. I would also like to defend the report that certainly in good faith and in spirit of solidarity, with no other purpose, has linked the manual.
However both rules are rules and agree, with you,re_solidworks your request to enforce them by removing that part of dialogue where the link was.

"errare humanum est"

returning to the program. .

Today I had the opportunity to test the procedure you had given me to clone the assemblies. I do not think I have applied it properly, in fact I can't pull the existing axioms-parts into the window that opens up to desta of the program. I don't understand where I'm wrong, can you give me an example to make me better understand?

thanks for the help
 
Sorry I'm late for the answers, but I had to disagree for work. .

I also apologize for asking for a manual for r2w but it is particularly difficult to find information material on the program and, as already posted earlier, it does not work me the help of the program. I would also like to defend the report that certainly in good faith and in spirit of solidarity, with no other purpose, has linked the manual.
However both rules are rules and agree, with you,re_solidworks your request to enforce them by removing that part of dialogue where the link was.

"errare humanum est"

returning to the program. .

Today I had the opportunity to test the procedure you had given me to clone the assemblies. I do not think I have applied it properly, in fact I can't pull the existing axioms-parts into the window that opens up to desta of the program. I don't understand where I'm wrong, can you give me an example to make me better understand?

thanks for the help
I write from the tablet that I can't post screenshots. for the "fast" compilation of the properties and root of the code there are 2 methods.
the first is the key above the description a little dx recalling the latest information entered, the second you fill out by dragging a row from the general list inside the code root box.
These methods are valid in creation, capture, import and cloning.
 