• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

pdm link e managee commesse

  • Thread starter Thread starter makeng
  • Start date Start date

makeng

Guest
Hello, everyone. I'd need a little "largo." :cool: we must put practically ex novo proe and pdmlink in the company where I work as technical manager. Currently they use inventor but with serious problems especially for the real possibility of parameterizing axioms and subaxis. my question is: how to better insert pdmlink? have suggestions and/or tips to start with the right foot? I thought I would immediately establish internal parameters to each part and then use them to manage the distinct bases that gradually form. we must "weight" from parametric projects that will then be modified and restructured according to the new orders. For example, I have to make a load ribbon, a hopper, an operating machine that is either standard or customized for some parts. of all I care to "reflect" the commission even if the pieces do not change as code.
another important thing: do you have experience on linking with ad hoc pumpkin software (with inqury type sql?). I hope I've been clear. Thank you
 
Hello, everyone. I'd need a little "largo." :cool: we must put practically ex novo proe and pdmlink in the company where I work as technical manager. Currently they use inventor but with serious problems especially for the real possibility of parameterizing axioms and subaxis. my question is: how to better insert pdmlink? have suggestions and/or tips to start with the right foot? I thought I would immediately establish internal parameters to each part and then use them to manage the distinct bases that gradually form. we must "weight" from parametric projects that will then be modified and restructured according to the new orders. For example, I have to make a load ribbon, a hopper, an operating machine that is either standard or customized for some parts. of all I care to "reflect" the commission even if the pieces do not change as code.
another important thing: do you have experience on linking with ad hoc pumpkin software (with inqury type sql?). I hope I've been clear. Thank you
Hello makeng,

actually the speech is a bit "proof" say, especially when we touch the plm button.
you have to insert means you have already bought pdmlink and proe?
Did you know that there was also the wgm for inventor, were you at least told?
on the fact of the internal parameters is fine, you can create as many as you want within the start part of the proe and also map in pdmlink the mandatory and optional fields including the committed field .
Usually there are precise metrics to be respected to ensure that everything works as a rule of art and here we meet the regulations.
It is also very important to define the life cycle and possibly the management of rdms and assignments, to define working groups, user permissions, etc., etc.
have you already dealt with an implementation or is it the first time?

I would like to understand what version of pdmlink we are talking about (9.0, 9.1 or even the new 10) and with what release of pro/e you want to interface it, you have to see the compatibility matrixes.

very important is the hardware chosen for the server where pdmlink will be installed and on what type of database (oracle or sql server).

for the interface with pumpkins we had some cases and there were no particular problems, but I inform myself better, since I was not involved in the first person.

greetings
 
inventor was used for about 10 years, but never apply the adactivity. as you well know this is the cancetto father that allows you to get the most in the passage to 3d. there are a tide of projects all "until". then a company that has 3 proe licenses including the aax module large assemblies, which for me is the absolute top for parametric design (I have completed very complex projects with an excellent gauze of changeability). I am pushing proe because I think it much more stable and mature especially for uin use pushed of the parametrizz. What I would like to know is:
1) is it possible to easily rename the parts and when connected, including the parameters before check in?
2) is the order managed keeping the parameters and the original codes?
3) for the shopping office how would you configure the location?
4) for the warehouse?
5) you can have feedback between the purchasing department (such as "not available, off-production, costs too etc.) and the warehouse (check availability, new item, etc.)

If you have news and/or examples to give me you would do me a great favor. I have to start designing the flow layout, but I am still at the old intralink (with all the proes and cons he had)

Thank you.


We'll pass right away at 10.0 as we leave now.
 
inventor was used for about 10 years, but never apply the adactivity. as you well know this is the cancetto father that allows you to get the most in the passage to 3d. there are a tide of projects all "until". then a company that has 3 proe licenses including the aax module large assemblies, which for me is the absolute top for parametric design (I have completed very complex projects with an excellent gauze of changeability). I am pushing pros because I think it much more stable and mature especially for uin use pushed of the parameterzz
.
How can you be wrong? I agree on everything!!!:smile:
What I would like to know is:
1) is it possible to easily rename the parts and when connected, including the parameters before check in?
in pdmlink there are no particular problems, even with massive modifications or single to the wtpart (windchill technology part), the problem semmai can be only in pro/e, at that point you have to lean on modelcheck with batch procedures, here opens a sublime world, we go to wedding.:smile:
2) is the order managed keeping the parameters and the original codes?
Yes, of course, you realize that in pdmlink you will work with the product, it is anything other than the good old intralink.
3) for the shopping office how would you configure the location?
4) for the warehouse?
license ligth user first of all, I imagine that u.acquisti and warehouse codifichino in zucchetti right? there is only a question of creating groups with only access distinctions and rights, to this I would also associate workflows.
There are various possibilities, you should see how you are structured now, what you want to keep and what you want to improve, in any case it is a tool that you can bend as you want.
5) you can have feedback between the purchasing department (such as "not available, off-production, costs too etc.) and the warehouse (check availability, new item, etc.)
Of course.
If you have news and/or examples to give me you would do me a great favor. I have to start designing the flow layout, but I am still at the old intralink (with all the proes and cons he had)

Thank you.
of examples and news I would have to bizzeffe, only that this is not the most suitable place to show you.
We'll pass right away at 10.0 as we leave now.
we are doing a pilot project for a well-known international company right these days we have finished the installation.
now we go to configure it heavily.
Keep in mind that we're at m010, wait till we finish the test and then I can tell you if everything went well. :smile:
 
Thank you very much! In the meantime, I see that I'm going to go deeper, and then I'll let you know. I think this aspect of design/management is like blood to the heart. It is true that without heart (proes) you are not going anywhere, but without blood to circulate the heart you need very little! we will feel again. then we could also think about deepening the speeches as they are of wood (so very close to you)
Hi.
 
Thank you very much! In the meantime, I see that I'm going to go deeper, and then I'll let you know. I think this aspect of design/management is like blood to the heart. It is true that without heart (proes) you are not going anywhere, but without blood to circulate the heart you need very little! we will feel again. then we could also think about deepening the speeches as they are of wood (so very close to you)
Hi.
Of course not.
Well for the talk of seeing yourself would be the smartest thing to do, only so you can make certain speeches and go more in detail.

are available
greetings
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top