marcofranz
Guest
hi to everyone, I’m parameterizing a bite and in the coupling to define the run of the mobile hook I’ve encountered problems to parameterize it in the management equations.
I had done this coupling with the limit distance command.
Now, once I have parameterized the various accomplishments, I thought I could manage an equation also for the values of that coupling, instead not.
problems are as follows:
- I try to put = before the values in the required fields, so as to put an equation in that command but I am not accepted this idea because you only have to enter numbers;
- I try to create an equation from the equations management table through the quota of this mating function (which turns out 0-170, because the jaw must move from the maximum width to the minimum/closed) but it was not correct because I can make a single equation that therefore gives me only one variable but the quota has two values.
I don't know if I could explain.
sent by my iPhone using tapatalk
I had done this coupling with the limit distance command.
Now, once I have parameterized the various accomplishments, I thought I could manage an equation also for the values of that coupling, instead not.
problems are as follows:
- I try to put = before the values in the required fields, so as to put an equation in that command but I am not accepted this idea because you only have to enter numbers;
- I try to create an equation from the equations management table through the quota of this mating function (which turns out 0-170, because the jaw must move from the maximum width to the minimum/closed) but it was not correct because I can make a single equation that therefore gives me only one variable but the quota has two values.
I don't know if I could explain.
sent by my iPhone using tapatalk