Marco Ramagini
Guest
Hello everyone,
I must carry out the project of a lift bridge for motorcycles of the type in figure (1). I already know that the discussion has been started several times but I have not found answer to my doubts. to start, I tried to schematize the machine with beams but already at this point I got stuck. According to my knowledge of construction science, I have come to conclude that the system is three times that are not determined (see figure (2)). I wondered if this first schematization was correct.
I thank everyone who wants to answer me.

I must carry out the project of a lift bridge for motorcycles of the type in figure (1). I already know that the discussion has been started several times but I have not found answer to my doubts. to start, I tried to schematize the machine with beams but already at this point I got stuck. According to my knowledge of construction science, I have come to conclude that the system is three times that are not determined (see figure (2)). I wondered if this first schematization was correct.
I thank everyone who wants to answer me.

