ingegnere000
Guest
Hello, everyone.
today we made a test we had to assemble two proceeds from fold and this time instead of channel they decided to try to cut the final parts for assembly at 45 degrees. I designed the piece with inventor I made the development and the quarry was just radius equal to thickness 3. the carpenter showed me that the edge above where the cut starts but it bakes with the other part and then to make the nesting I rifilato otherwise they should have cut them all by hand. the problem is that by removing the edge the piece is a little smaller 3 mm less. the thing that leaves me perplexed and that I followed the development of the program literally. Thank you.
today we made a test we had to assemble two proceeds from fold and this time instead of channel they decided to try to cut the final parts for assembly at 45 degrees. I designed the piece with inventor I made the development and the quarry was just radius equal to thickness 3. the carpenter showed me that the edge above where the cut starts but it bakes with the other part and then to make the nesting I rifilato otherwise they should have cut them all by hand. the problem is that by removing the edge the piece is a little smaller 3 mm less. the thing that leaves me perplexed and that I followed the development of the program literally. Thank you.