Ciuchin0
Guest
I found several discussions about it, especially for the creation of car lanes.
I still have a few questions.
I do not work on topographic surfaces, but rather close to a plate (created with the command foundations: plate) stratigraphically I care to place a screed in cls that base for the pavement of the basement, ergo I believe to have to create a "floor" thickness 10 cm above the plate. for the creation of road lanes, signals on the ground etc as a continuation? Do I always make floors? and what thickness imposed? 0.001 m? Why do they see? thanks for the advice.
I still have a few questions.
I do not work on topographic surfaces, but rather close to a plate (created with the command foundations: plate) stratigraphically I care to place a screed in cls that base for the pavement of the basement, ergo I believe to have to create a "floor" thickness 10 cm above the plate. for the creation of road lanes, signals on the ground etc as a continuation? Do I always make floors? and what thickness imposed? 0.001 m? Why do they see? thanks for the advice.