Hello, everyone.
I've got a little bit of a problem. in a particular, whose variants I manage through ft, a quota comes from a calculation that I solve through relationships. when the result changes I must remember to manually change the value in the ft, and here I am very annoyed because I am never sure to have the updated data.
Is there the possibility of inserting directly into the ft cell, through parameters, reports etc., the result of the calculation?
thanks, greetings
I've got a little bit of a problem. in a particular, whose variants I manage through ft, a quota comes from a calculation that I solve through relationships. when the result changes I must remember to manually change the value in the ft, and here I am very annoyed because I am never sure to have the updated data.
Is there the possibility of inserting directly into the ft cell, through parameters, reports etc., the result of the calculation?