• This forum is the machine-generated translation of www.cad3d.it/forum1 - the Italian design community. Several terms are not translated correctly.

what is the work of engineer today?

attention to the words, we talk about "distinct insertion in management" or management (the same). This does not add value, of course.
what you indicate is correct, and is part of the design work.
The right term to use maybe is "data entry", which can also make a 5-year-old child, intelligently shaping a distinct multi-level is another thing!
 
The right term to use maybe is "data entry", which can also make a 5-year-old child, intelligently shaping a distinct multi-level is another thing!
again, attention to the words; I wrote "...what you indicate is correct, is part of the design work...."for which, there is no contradiction with what written by the colleague and you.
 
but my intervention did not want to contradict your statements at all! it was only to make an infinitesimal contribution to the discussion. I'm sorry, but I haven't been to the bran academy yet.
again, attention to the words; I wrote "...what you indicate is correct, is part of the design work...."for which, there is no contradiction with what written by the colleague and you.
 
the designer has different tasks and under different activities than the type and size of the company in which he works.

In my opinion it must:
- take the specific technique, read it, understand it and find errors or however critically understand what needs to be done and re-discussed with colleagues and commercials
- know how to make calculations, before leaving to do the job, choose the reference machines and evaluate the scenarios
- calculate and design the machine, drives, cinemas, study behaviors and choose the types to be adopted by evaluating the costs. make fem, spreadsheets, etc.
- model the machine not all its parts, make the puts on the table and realize the distinct manufacturing

for the senior version there is also the management of the plant commission and therefore also the work of colleagues who do his own work on the single machines or zones....with the consequence that he designs a little less and manages more.

helps to empower, manage multiple tasks simultaneously and then in a year manage multiple volumes of work.
 

Forum statistics

Threads
44,997
Messages
339,767
Members
4
Latest member
ibt

Members online

No members online now.
Back
Top