vegeth
Guest
Good morning to all,
I have this working necessities, I have created a dwg file with autocad 2009 as a basis to create other designs, I need to know how much time I use for a job and until here no problem because I use the time command, I can see the actual time in real time or zero everything and until here there is no problem.
when the file is saved, I click on it with the right mouse button (downside menu), click on properties, drop down statistics and I find the total editing time e.g. 9minuti.(which corresponds exactly to the time command autocad) and here come to my problem, I this drawing base (practically a master) I have to copy it to create another identical time with in addition of other things... after in a few words I have to reset the time of the master so that doing any copy, the copy in question always starts me from a time zero! I hope to be explained.
Thank you all for the availability as usual.
Thank you.
I have this working necessities, I have created a dwg file with autocad 2009 as a basis to create other designs, I need to know how much time I use for a job and until here no problem because I use the time command, I can see the actual time in real time or zero everything and until here there is no problem.
when the file is saved, I click on it with the right mouse button (downside menu), click on properties, drop down statistics and I find the total editing time e.g. 9minuti.(which corresponds exactly to the time command autocad) and here come to my problem, I this drawing base (practically a master) I have to copy it to create another identical time with in addition of other things... after in a few words I have to reset the time of the master so that doing any copy, the copy in question always starts me from a time zero! I hope to be explained.
Thank you all for the availability as usual.
Thank you.