Hello
as a company we are thinking of switching from the current intralink 3.4 and wf2 situation to new intralink 9 and wf5 versions.
I wanted your opinion on the new sw, those of the ptc must always obscure them and talk about incredible performance increases. for this reason I addressed you to have an opinion of "normal" users. .
Thank you.
 
I don't know how to tell you, because I never used it.
the differences between wf2 and wf5 are there and you notice.
Keep in mind that there are 6 years of difference between one version and the other and such a period in software development means a lot.
I think that the list of novelties can fill a quiet volume with a hundred pages.
then depends on what you do with pro/e.
 
Hello
as a company we are thinking of switching from the current intralink 3.4 and wf2 situation to new intralink 9 and wf5 versions.
I wanted your opinion on the new sw, those of the ptc must always obscure them and talk about incredible performance increases. for this reason I addressed you to have an opinion of "normal" users. .
Thank you.
right these days we are doing the same thing, passing to windchill pdmlink and to wf5.

as mentioned by maxopus, the difference between wf2 and wf5 is so much, regarding pdmlink still do not know, we are not yet operational.

I can tell you the whole operation costs a bang.
 
I don't know how to tell you, because I never used it.
the differences between wf2 and wf5 are there and you notice.
Keep in mind that there are 6 years of difference between one version and the other and such a period in software development means a lot.
I think that the list of novelties can fill a quiet volume with a hundred pages.
then depends on what you do with pro/e.
Thank you.
mainly we design plastic components and related mold studies. in more assemblies of electric motors, to max a hundred components

I am interested in knowing in particular if with wf5 you can notice a reduction of the times (to be understood also as minor problems to be solved or solved faster)

Thank you.
 
right these days we are doing the same thing, passing to windchill pdmlink and to wf5.

as mentioned by maxopus, the difference between wf2 and wf5 is so much, regarding pdmlink still do not know, we are not yet operational.

I can tell you the whole operation costs a bang.
on the cost I noticed!! !
have you had productive stops? or did you do 2 servers in parallel to reduce time losses?
Thank you.
 
on the cost I noticed!! !
have you had productive stops? or did you do 2 servers in parallel to reduce time losses?
Thank you.
for now we have two servers, one to continue working and another to install the new software.

as soon as the new will be ready we will import the data and we will start to full regime.

It is not such a simple thing, installation and configuration problems are always engulfed.

think well to backup everything.
 
for now we have two servers, one to continue working and another to install the new software.

as soon as the new will be ready we will import the data and we will start to full regime.

It is not such a simple thing, installation and configuration problems are always engulfed.

think well to backup everything.
Of course! as usual is not as simple as ptc!!:angry:
 
the company that works for the study in which I work in January has passed from
wf2 to wf4 & windchill
What's happened... the pcs (workstation) on which we work have become obsolete. to us will have to change two/three pcs but the company for which we work has a few hundred users.

see discussion attached. . .http://www.cad3d.it/forum1/showthread.php?t=17572&page=2then if someone has different experiences and wants to tell us what hardware they work with.. .
 
the company that works for the study in which I work in January has passed from
wf2 to wf4 & windchill
What's happened... the pcs (workstation) on which we work have become obsolete. to us will have to change two/three pcs but the company for which we work has a few hundred users.

see discussion attached. . .http://www.cad3d.it/forum1/showthread.php?t=17572&page=2then if someone has different experiences and wants to tell us what hardware they work with.. .
if you have a few hundred cad operators, they are company that you can allow software-hardware upgrade.
the speech is very complex but, keeping the updated production tools is part of the game ... and then there is one thing that I don't understand, because they went to wf4 and not to wf5 directly? So maybe they save money?
 
if you have a few hundred cad operators, they are company that you can allow software-hardware upgrade.
the speech is very complex but, keeping the updated production tools is part of the game ... and then there is one thing that I don't understand, because they went to wf4 and not to wf5 directly? So maybe they save money?
...I am also interested in seeing that we thought we would go directly to wf5:confused:
 
And then there's something I don't understand, because they went to wf4 and not to wf5 directly? So maybe they save money?
Maybe because they think it's more proven than wf5...
p.s.: Since you are a conterranean I can tell you that the main seat is a bologna in via battendarno
 
Maybe because they think it's more proven than wf5...
p.s.: Since you are a conterranean I can tell you that the main seat is a bologna in via battendarno
:smile: I had guessed! I did the thesis with them!
 
Maybe because they think it's more proven than wf5...
p.s.: Since you are a conterranean I can tell you that the main seat is a bologna in via battendarno
I think I understand who I am and what money they have on track, because the sector that cure them never knows crisis.
 
I think I understand who I am and what money they have on track, because the sector that cure them never knows crisis.
smoke? ? ? . . .
I to all those who say they want to stop, I strongly disagree, I tell them to blow cigarettes and then throw them away... But don't take off my job.
 
on the subject I have expressed myself several times, currently I went to wf4 and intra 3.4 m070 since to pass to wf5 it would have had to pass to intra 9.1 m020 with migration costs that I do not tell you
However, I must say that for small businesses ptc is presenting a light version of management (I do not remember the name but surely there will be someone who knows + me ) that is compatible with wf5 that would have almost all the functions of intra 3.4 but for now it requires a manual migration
the cost is quite attractive and, from my point of view only operator cad, would be the only solution to switch to wf5
when will the crisis pass???!!!!???!!! we will propose the thing to the direction

try to inform you from the dealer and then let us know the vs opinions

greetings
 
on the subject I have expressed myself several times, currently I went to wf4 and intra 3.4 m070 since to pass to wf5 it would have had to pass to intra 9.1 m020 with migration costs that I do not tell you
However, I must say that for small businesses ptc is presenting a light version of management (I do not remember the name but surely there will be someone who knows + me ) that is compatible with wf5 that would have almost all the functions of intra 3.4 but for now it requires a manual migration
the cost is quite attractive and, from my point of view only operator cad, would be the only solution to switch to wf5
when will the crisis pass???!!!!???!!! we will propose the thing to the direction

try to inform you from the dealer and then let us know the vs opinions

greetings
interesting you know more
our ptc nopn retailer told us about it! we are in about fifteen and try to sell us pdm links! :mad:
 
on the subject I have expressed myself several times, currently I went to wf4 and intra 3.4 m070 since to pass to wf5 it would have had to pass to intra 9.1 m020 with migration costs that I do not tell you
However, I must say that for small businesses ptc is presenting a light version of management (I do not remember the name but surely there will be someone who knows + me ) that is compatible with wf5 that would have almost all the functions of intra 3.4 but for now it requires a manual migration
the cost is quite attractive and, from my point of view only operator cad, would be the only solution to switch to wf5
when will the crisis pass???!!!!???!!! we will propose the thing to the direction

try to inform you from the dealer and then let us know the vs opinions

greetings
This is windchill productpoint, find the information at the following link:
http://www.ptc.com/products/windchill/productpoint/
 
As I wrote on it, the whole thing costs a bang.

cost a cask service activity for installation/configuration/migration.

costs a bang update the server (in our case we will keep the ws a little longer).

cost a bang the time lost to go to regimen with the new system.

In short, there is to be unhooked, all this to work with the wf5.

I personally believe that the ptc could do more, but they decided to abandon the pro/i users, and this is the result.

the least they could implement a policy of discounts on maintenance and assistance, but so much so...
 
As I wrote on it, the whole thing costs a bang.

cost a cask service activity for installation/configuration/migration.

costs a bang update the server (in our case we will keep the ws a little longer).

cost a bang the time lost to go to regimen with the new system.

In short, there is to be unhooked, all this to work with the wf5.

I personally believe that the ptc could do more, but they decided to abandon the pro/i users, and this is the result.

the least they could implement a policy of discounts on maintenance and assistance, but so much so...
If you want to set up a complete system of high-level plm, you can't think of getting away with 2 money.
If you want to pass only the licenses cad to the wf5 the policy of discounts there is. I requested an offer to my trusted var and if I passed to the wf5 I would save a lot of money compared to unpaid maintenance (if I had continued to pay for it).
Try to do the same thing with a cat or nx and then let me know how much money they ask you.
semmai problems are other (and common to all software houses) and that is to allow customers to choose between two types of maintenance, one for the simple renewal of the software and the other including also of the online service part.
For example in my case, after years of pro/e, I no longer need online assistance and would like to pay only the update of the software paying a 50% of the maintenance fee and instead this is not possible with any software.
 
If you want to set up a complete system of high-level plm, you can't think of getting away with 2 money.
If you want to pass only the licenses cad to the wf5 the policy of discounts there is. I requested an offer to my trusted var and if I passed to the wf5 I would save a lot of money compared to unpaid maintenance (if I had continued to pay for it).
Try to do the same thing with a cat or nx and then let me know how much money they ask you.
semmai problems are other (and common to all software houses) and that is to allow customers to choose between two types of maintenance, one for the simple renewal of the software and the other including also of the online service part.
For example in my case, after years of pro/e, I no longer need online assistance and would like to pay only the update of the software paying a 50% of the maintenance fee and instead this is not possible with any software.
I agree, but if you put us that it will soon pop up in the company windows 7 here is that my intralink 3.4 no longer holds and therefore also the content of wf4 is not enough.
I don't need to have super performance, I just need data management cad and nothing more and then I have to do the "double mortal leap" or stay so with all the risks that follow it..... and think we pay a lot of nice maintenance money for little or nothing! :mad:
 