Guest
I would be comfortable to tie the distance between two parallel planes from a quota, variable according to the value of a certain equation or global variable.

The problem is that I can only do this by using auxiliary geometries on which to build these plans, for example design a sketch guided by the above variables and then use it to generate the bound plans. is it possible to avoid doing this tour?

p.s. why does every time I edit the value of a global variable give me away the comment I put on it?
 
I would be comfortable to tie the distance between two parallel planes from a quota, variable according to the value of a certain equation or global variable.

The problem is that I can only do this by using auxiliary geometries on which to build these plans, for example design a sketch guided by the above variables and then use it to generate the bound plans. is it possible to avoid doing this tour?

p.s. why does every time I edit the value of a global variable give me away the comment I put on it?
hi, I certainly don't understand what you need, but in the example you find a plan that is from the other of the measure "pippo" and "pippo" is a variable/equation. . .
 

Attachments

I would be comfortable to tie the distance between two parallel planes from a quota, variable according to the value of a certain equation or global variable.

The problem is that I can only do this by using auxiliary geometries on which to build these plans, for example design a sketch guided by the above variables and then use it to generate the bound plans. is it possible to avoid doing this tour?

p.s. why does every time I edit the value of a global variable give me away the comment I put on it?
Hello hunting

If you just tie the distance between two floors of which one stop there is no problem because when you build the plan you will take as a reference another, the distance quota you can connect it to an equation like all other odds.
otherwise you better explain what you want to do.

for the comments I try then I tell you.

Reggio beat me on time
 
even if two colleagues preceded me, I publish the same
A video.
for the comments, I don't know, I never happened. :smile:
[youtube]Aquinygoqp8o[/youtube]
 
Here, double-click on the floor, is that I'm still used to if it shows you the quota at the first click.

I'm sorry I'm new to the industry.
 
hi, I certainly don't understand what you need, but in the example you find a plan that is from the other of the measure "pippo" and "pippo" is a variable/equation. . .
version 2011, I can't open it, however I understood from the video of mike1967, I had lost in a glass of water.... .
 
idem, it is "figo" but very dangerous, I have already encapsulated with 2009
If I'm not wrong.
Also because not having the locking to the rotation of the concentric bond, maybe tic apita to have to re-up a table of a 5000-piece machine because by mistake you turned a washer... .
This of the changes that you make by ironing-torce is also one of the most controversial things about synctech if, who loves it and who doesn't trust (like me).
 