I'll give you my problem.
I have to enter a scale that covers me 5 floors, the problem is that I can't get it to the end. in the settings both that as the final constraint puts the 2nd or 5th floor does not change anything always to the 1st. if instead I go to insert as final bond on the 1st floor and as next the 2° then I can cover also the latter, but still there are no other successive levels to indicate and then I remain screwed...
I have to enter a scale that covers me 5 floors, the problem is that I can't get it to the end. in the settings both that as the final constraint puts the 2nd or 5th floor does not change anything always to the 1st. if instead I go to insert as final bond on the 1st floor and as next the 2° then I can cover also the latter, but still there are no other successive levels to indicate and then I remain screwed...