One thing is the passage from the 2d "constructive" to the 2d "documental".true but apart from the time lost unnecessarily to make useless beautiful tables in 2d, today a 2d design of a modern bumper of a car is impossible to realize (useful for construction I mean).
And here the time saving, from the designer's point of view can be huge. but it is not said to be the same as you come to whom then the piece produces it at a certain price or in a certain way.
But you were talking about the 3rd note. From the technical department's point of view, time is identical to the 2d document because the information is the same. It is true that from the 3rd note the 2d boards can be obtained (it reminds me cadds5 /4x for those who had the pleasure) . can change something from the productive point of view and quality control, but if there are all the downstream equipment that "mangiano" the 3d noted. Otherwise someone, "at the door", will have to put the tolerances on critical quotas.
and if a company has 100-200-500 suppliers, it is sure that there will be someone who not only does not have the "reader" for the noted 3D, but does not even have the nx/v5/creo that all suppliers should use.
but he's gonna have to fall a pole or a tecnigraph, depending on what he agreed with the shopping office.